Water-Inflated Cofferdam for TV Show Curse of Oak Island

Pipelines

Pipelines

Pipelines: Grand Blanc, MI

Location: Grand Blanc, MI Cofferdam Size: 8′ high x 450′ long Water Depth: 5-6′ Installation Time: 9 hours Project Description: A Dam-It Dams cofferdam was used to dewater the work site, thus allowing the contractor to locate and fix anomalies in the gasline. Pipeline Installation A dry work environment is required for the installation and/or […]

Pipelines: Lansing, MI

Location: Lansing, MI Cofferdam Size: 4′ high x 100′ long Water Depth: 3′ Installation Time: 4 hours Project Description: Pipeline Repair Pipeline Installation A dry work environment is required for the installation and/or repair of utility, oil and other pipelines. Dewatering, damming or diverting water are the best options for creating such an environment. Our […]

Pipelines: Harrisburg , PA

Location: Harrisburg, PA Cofferdam Size: 4′ high x 100′ long Water Depth: 3′ Installation Time: 4 hours Project Description: Contractor needed to block the river to install a pipeline across it. Pipeline Installation A dry work environment is required for the installation and/or repair of utility, oil and other pipelines. Dewatering, damming or diverting water […]

Email
Quote
Text Us
Reviews