Dundee, MI
Cofferdam Sizes: 8′ high x 100′ long Water Depth: 5-6′ Installation Time: 8 hours Project Description: A Dam-It Dams cofferdam was used to temporarily block water flow in a river to allow installation of a new 36″ gas main. River Crossing Spanning a river above or below water often requires a dry work environment. The …
Denver, CO
Location: Denver, CO Cofferdam Sizes: 8′ high x 100′ long Water Depth: 5.5′ Installation Time: 4.5 hours per dam Project Description: Dam-It Dams cofferdams were used to create a dry work site for the contractor to install a new spillway. River Crossing Spanning a river above or below water often requires a dry work environment. …
Hancock, NY
Location: Hancock , NY Cofferdam Sizes: Two 4′ high x 100′ long Water Depth: 3′ Installation Time: 4 hours Project Description: Install a new 36-inch gas main on a tributary to the Delaware River. River Crossing Spanning a river above or below water often requires a dry work environment. The length of the span, water …