Water-Inflated Cofferdam for TV Show Curse of Oak Island

Water Filled Dam River Crossing

Denver, CO

Location: Denver, CO Cofferdam Sizes: 8′ high x 100′ long Water Depth: 5.5′ Installation Time: 4.5 hours per dam Project Description: Dam-It Dams cofferdams were used to create a dry work site for the contractor to install a new spillway. River Crossing Spanning a river above or below water often requires a dry work environment. …

View Full Article

Hancock, NY

Temporary Cofferdam RIver Crossing 12

Location: Hancock , NY Cofferdam Sizes: Two 4′ high x 100′ long Water Depth: 3′ Installation Time: 4 hours Project Description: Install a new 36-inch gas main on a tributary to the Delaware River. River Crossing Spanning a river above or below water often requires a dry work environment. The length of the span, water …

View Full Article

Lansing, MI

Cofferdam Pipeline Protection 2

Location: Lansing, MI Cofferdam Size: 4′ high x 100′ long Water Depth: 3′ Installation Time: 4 hours Project Description: Pipeline Repair Pipeline Installation A dry work environment is required for the installation and/or repair of utility, oil and other pipelines. Dewatering, damming or diverting water are the best options for creating such an environment. Our …

View Full Article