Location: Acton, MA
Cofferdam Size: 8′ high x 200′ long
Water Depth: 6′
Installation Time: 7 hours
Project Description: A Dam-It Dams cofferdam was used for dewatering the work site. The contractor needed a dry environment for extending the existing bridge.
Bridge Repairs
A Dam-It Dams portable cofferdam is the ideal solution for blocking or diverting water flow when needed to repair or replace a bridge.