Paris, IL
Location: Paris, IL Cofferdam Sizes: 8′ high x 225′ long, and 8′ tall x 50′ long Water Depth: 6′ Installation Time: 7.5 hours Project Description: Dewater project site to allow contractor to repair broken concrete on the spillway. Spillway Repairs The primary purpose of a spillway is to direct excess water or other liquids from ...
View Full PostSt Paul , MN
Location: St. Paul, MN Cofferdam Size: 8′ high x 250′ long Water Depth: 6′ Installation Time: 11 hours Project Description: Restore shoreline. Shoreline Restoration Water is one of Mother Nature’s most powerful forces. It can wreck havoc on shorelines over a period of time. To restore eroded beaches and other waterfront properties, cofferdams are the ...
View Full PostHoughton Lake, MI
Location: Houghton Lake, MI Cofferdam Size: 8′ high x 150′ long. Water Depth: 6′ Installation Time: 4.5 hours Project Description: Remove bottom sediment to deepen canal for improved boat access. Cofferdam Dredging The dredging process can be greatly expedited with the use of water-filled cofferdams from Dam-It Dams. By holding back water on the site, ...
View Full PostWetlands Preservation Stockbridge, MI #1
Wetlands Protection- Location: Stockbridge, MI Cofferdam Size: 4′ high x 120′ long Water Depth: 3′ Installation Time: 3.5 hours Project Description: Repair break in gas main Wetlands Wetland protection is a vital concern. When a project site is located in a wetland, unique equipment is often needed to protect the area from further damage while ...
View Full PostWetlands Preservation Stockbridge, MI #2
Wetlands Protection- Location: Stockbridge,MI Cofferdam Size: 8′ high x 120′ long Water Depth: 4-5′ Installation Time: 3-5 hours Project Description: Repair break in gas main Wetlands Preservation Wetlands Protection is a vital concern. When a project site is located in a wetland, unique equipment is often needed to protect the area from further damage while ...
View Full PostWetlands Preservation – Arlington Heights, IL
Location: Arlington Heights, IL Cofferdam Size: Three 4′ high x 200′ long Water Depth: 3′ Installation Time: 10 hours Project Description- Repair a gas pipeline in a wetland. Wetlands Wetland protection is a vital concern. When a project site is located in a wetland, unique equipment is often needed to protect the area from further ...
View Full PostDenver, CO
Location: Denver, CO Cofferdam Sizes: 8′ high x 100′ long Water Depth: 5.5′ Installation Time: 4.5 hours per dam Project Description: Dam-It Dams cofferdams were used to create a dry work site for the contractor to install a new spillway. River Crossing Spanning a river above or below water often requires a dry work environment. ...
View Full PostHancock, NY
Location: Hancock , NY Cofferdam Sizes: Two 4′ high x 100′ long Water Depth: 3′ Installation Time: 4 hours Project Description: Install a new 36-inch gas main on a tributary to the Delaware River. River Crossing Spanning a river above or below water often requires a dry work environment. The length of the span, water ...
View Full PostLansing, MI
Location: Lansing, MI Cofferdam Size: 4′ high x 100′ long Water Depth: 3′ Installation Time: 4 hours Project Description: Pipeline Repair Pipeline Installation A dry work environment is required for the installation and/or repair of utility, oil and other pipelines. Dewatering, damming or diverting water are the best options for creating such an environment. Our ...
View Full PostHarrisburg , PA
Location: Harrisburg, PA Cofferdam Size: 4′ high x 100′ long Water Depth: 3′ Installation Time: 4 hours Project Description: Contractor needed to block the river to install a pipeline across it. Pipeline Installation A dry work environment is required for the installation and/or repair of utility, oil and other pipelines. Dewatering, damming or diverting water ...